/* $Id: runlist_jun03.txt,v 1.1 2003/10/01 17:55:23 mueller Exp $ */ List of runs taken in June-August '03 Beamtime: date logbook type from to Beam Target Trigger/Comment 2003-06-30 b1p164 ### Setting up for Cosmics tests; P=1000mbar; Vprop=2.55 kV; Vcath=1.10+1.30 kV; 2003-06-30 b1p164 ### Trigger: 2nd prop plane left+right; FADC stop delay 2003-06-30 b1p164 run 1200 1209 MUSI cosmics Trig: 2nd prop plane; FADC 19,26 out 2003-06-30 b1p164 run 1210 1210 MUSI cosmics Trig: 2nd prop plane & ToF direct coincidence 2003-07-01 b1p165 run 1211 1214 MUSI cosmics Prop (2nd) & ToF trig; Vprop=2.65 kV; FADC 16,17 mapped as 19,26 2003-07-02 b1p165 ### replace FADC 19,26; now all FADC o.k. 2003-07-02 b1p165 run 1215 1217 MUSI cosmics Prop (2nd) & ToF trig; with final FADC configuration 2003-07-02 b1p165 ### added LAND into DACQ 2003-07-05 b1p166 run 1218 MUSI cosmics Prop (2nd) & ToF FCLR cosmics trigger; VProp=2.7 kV; ToF in now 2003-07-05 b1p166 ### redone FBUS pedestals (used so far April settings) 2003-07-05 b1p166 run 1219 MUSI cosmics Prop (2nd) & ToF FCLR cosmics trigger; ToF valid now 2003-07-05 b1p166 run 1220 1221 MUSI cosmics Prop (1st+2nd) & ToF FCLR cosmics trigger; 2003-07-05 b1p166 run 1222 MUSI cosmics Prop (1st+2nd) & ToF FCLR cosmics trigger; Tof thres 18mV (was 33) 2003-07-05 b1p167 ### added readout type 5 (no FADC data) 2003-07-05 b1p167 run 1223 1231 MUSI cosmics " 2003-07-06 b1p167 run 1232 1256 MUSI cosmics Prop (1st+2nd) & ToF FCLR trig, now with full ToF + Prop config !! 2003-07-07 b1p168 run 1257 1261 MUSI cosmics Prop (1st+2nd) trig; stopdly=580 2003-07-08 b1p170 ### added 3rd QDC in region 2 2003-07-08 b1p170 run 1262 1280 MUSI cosmics Prop (1st+2nd) trig; prop thres=-20; Only 1st+2nd PC plane read 2003-07-08 b1p170 run 1281 1283 LAND cosmics LAND cosmics; use ReadType=5 2003-07-09 b1p171 ### redone FADC ped+base; ToF thres->33; Vprop=2.48 kV 2003-07-09 b1p171 ### Beam 124Sn @ 600 MeV 2003-07-10 b1p171 run 1284 1285 124Sn Au/516 Paddle + 2^-7 beam; Aladin=880 2003-07-10 b1p171 run 1286 1298 124Sn Au/516 Paddle + 2^-7 beam; Aladin=860 2003-07-10 b1p173 ### Fixed inversion of FADC 11,14 trigger; shifted ToF timing up 16 ns; 2003-07-11 b1p179 ### Added 3rd TDC in region 3; Added TDC 15,16 to FBUS (for HODO) 2003-07-11 b1p179 ### DAQ and anal code tagged BT_Sn_Beam_03_07_11 2003-07-11 b1p179 run 1299 1304 124Sn Sn/505 Paddle + 2^-7 beam; Aladin=860 2003-07-11 b1p179 ### run_1299.lmd damaged due to disk errors on folx02; switch to backup archive relay 2003-07-11 b1p179 run 1305 1318 124Sn Sn/505 Paddle + 2^-7 beam; Aladin=860 2003-07-12 b1p181 ### folx02 also failed; switch to /d/kp3 archiving 2003-07-12 b1p181 ### CAMAC QDC/TDC signals tuned up during runs 1310-1318 2003-07-12 b1p181 run 1319 1320 124Sn Sn/505 dito 2003-07-12 b1p181 run 1321 124Sn Sn/505 dito, but beam now better centered, 25k/spill 2003-07-12 b1p181 ### FADC pedestals redone 2003-07-12 b1p181 run 1322 1326 124Sn Sn/505 Paddle + 2^-7 beam 2003-07-12 b1p181 run 1322 1326 124Sn Sn/505 Paddle + 2^-7 beam 2003-07-12 b1p181 run 1327 1375 124Sn Sn/505 Paddle + 2^-7 beam, HV start tube uped by 200 V 2003-07-12 b1p185 run 1376 1394 124Sn Sn/505 dito. 2003-07-13 b1p185 run 1395 1408 124Sn Sn/505 Paddle trigger only 2003-07-13 b1p185 run 1409 1415 124Sn Sn/505 Paddle + 2^-7 beam 2003-07-13 b1p185 ### Anode PreAmp FADC phys 10(6) failed between 07:56:23 08:03:00 during run 1416 2003-07-13 b1p185 ### Found that HVprop was 2.49 rather than 2.48 kV 2003-07-13 b1p185 run 1416 1440 124Sn Sn/505 Paddle + 2^-7 beam 2003-07-13 b1p188 ### Found that ToF wall has a problem (developped between 1420 and 1430) 2003-07-13 b1p188 run 1441 1443 124Sn Sn/505 Paddle + 2^-7 beam; ToF Wall switched OFF 2003-07-13 b1p188 run 1444 124Sn Sn/505 Paddle + 2^-7 beam; ToF back, but L rear bot discon.; GateGrid OFF !!! 2003-07-13 b1p188 run 1445 1450 124Sn Sn/505 Paddle + 2^-7 beam; GateGrid ON again 2003-07-13 b1p189 run 1451 1453 124Sn Sn/505 Paddle + 2^-7 beam; On ToF A front bot + L rear top also discon. 2003-07-13 b1p189 run 1454 1466 124Sn Sn/505 Paddle + 2^-7 beam; ToF A front bot + L rear top reconnected 2003-07-14 b1p190 ### Found that several ToF HV channels went of, 1/4 of ToF wall out 2003-07-14 b1p190 run 1467 1493 124Sn Sn/505 Paddle + 2^-7 beam; 2003-07-14 b2p003 run 1494 124Sn Sn/505 Paddle + 2^-4-7 beam; With Z diode in beam (see ADC 6) 2003-07-14 b2p003 run 1495 124Sn Sn/505 dito, but some signals were inspected during run 2003-07-14 b2p004 run 1496 124Sn Sn/505 2^-4-5 beam; Z in and strip in; 2003-07-14 b2p004 run 1497 124Sn Sn/505 2^-4-5 beam; Z in and strip in; ROLU closes to widen beam 2003-07-14 b2p004 run 1498 124Sn Sn/505 2^-4-5 beam; Z in and strip in; beam defocused 2003-07-14 b2p004 run 1499 124Sn Sn/505 2^-4-5 beam; Z in and strip in; another focus 2003-07-14 b2p004 run 1500 124Sn Sn/505 2^-4-5 beam; Z in and strip in; sweeping with steerer 2003-07-14 b2p004 run 1501 124Sn Sn/505 2^-4-5 beam; Z in and strip in; another beam tune 2003-07-14 b2p005 run 1502 124Sn Sn/505 2^-4-5 beam; Z in and strip in; with good focus 2003-07-15 b2p005 run 1503 1518 124Sn Sn/505 Paddle + 2^-7 beam; 2003-07-15 b2p007 run 1519 1521 124Sn Sn/505 Paddle + 2^-7 beam; 2003-07-15 b2p007 run 1522 124Sn none beam; wedge run (front 0->2000) 2003-07-15 b2p007 run 1523 124Sn none beam; wedge run (back 2000->0) 2003-07-15 b2p007 run 1524 124Sn none beam; wedge run (back 0->1084 inverted) 2003-07-15 b2p007 run 1525 124Sn none beam; wedge run (front 1084->0 inverted) 2003-07-15 b2p007 ### Si Strip counter now in; Aladin at 860 2003-07-15 b2p008 run 1526 1538 124Sn Sn/505 Paddle + 2^-7 beam; With Si Strip 2003-07-15 b2p008 ### Problems with ToF HV, exchanged Controller 2003-07-15 b2p008 run 1539 1555 124Sn Sn/505 Paddle + 2^-7 beam; With Si Strip 2003-07-16 b2p010 run 1556 124Sn Sn/505 Paddle + 2^-7 beam; Si Strip out again 2003-07-16 b2p011 ### night 16/17 was not productive due to SIS problems. No data taken 2003-07-17 b2p011 run 1557 ----- ----- Random pulser; FADC pedestal run (with ped-sub off) 2003-07-17 b2p012 ### Added 4th QDC (N=7) to region 2. 2003-07-17 b2p012 run 1558 1565 LAND cosmics LAND cosmics run; 2003-07-17 b2p013 ### Found that HVcath was 19.5kV; readjusted back to nominal 19.8 kV. 2003-07-17 b2p013 ### Tests with beam through FRS with 124Sn @ 517 MeV/u 2003-07-17 b2p013 run 1566 1567 124Sn none 2^3 beam; 2003-07-18 b2p013 run 1568 124Sn none triggered directly with FRS S2-L; using cosmics readout 2003-07-18 b2p014 run 1569 124Sn none dito, FRS beam shifted 13mm right, continue shifting 2003-07-18 b2p014 run 1570 124Sn none dito, FRS beam shifted to paddle 7-8, continue shifting to 1 2003-07-18 b2p014 run 1571 124Sn none dito, FRS beam shifted to paddle 4-5, continue shifting to 5 2003-07-18 b2p014 run 1572 124Sn none with ALADiN beam trigger again; FRS broad parallel tune 2003-07-18 b2p014 run 1573 124Sn none dito, FRS focus on S2 2003-07-18 b2p014 run 1574 124Sn none again FRS S2 trigger, FRS beam on paddle 13 2003-07-18 b2p014 run 1575 124Sn none dito, but 1:2 attenuator in channel 13 2003-07-18 b2p015 ### Back to 600 AMeV 124 Sn physics operation, ALADiN to 860 (reading), Au target 2003-07-18 b2p015 run 1576 1582 124Sn Au/516 paddle + 2^7 beam; 25 k/spill 2003-07-18 b2p015 ### run 1582 ended with a write error, data seems to be o.k. 2003-07-18 b2p015 run 1583 1587 124Sn Au/516 paddle + 2^7 beam; 25 k/spill 2003-07-18 b2p016 run 1588 HODO cosmics Trigger with HODO or (using cosmics readout) 2003-07-18 b2p016 run 1589 1591 LAND cosmics LAND cosmics 2003-07-18 b2p016 run 1592 1593 124Sn Au/516 2^7..3 beam + Paddle; Si strip in, low beam 6000/spill 2003-07-18 b2p016 run 1594 124Sn Au/516 paddle + 2^7 beam; quite low beam 2003-07-18 b2p016 run 1595 1605 124Sn Au/516 paddle + 2^7 beam; now 25k/spill 2003-07-19 b2p017 run 1606 1621 124Sn Ni/440 paddle + 2^7 beam; 2003-07-19 b2p018 ### Repairs: Fix broken anode preamps; patch bad pad PreAmp; exchange gate driver on pcs=9,10,11 2003-07-19 b2p019 run 1622 ToF LASER ToF laser (triggered with M>=4; use cosmics readout) 2003-07-19 b2p019 run 1623 1632 PROP alpha trigger 1st+2nd Prop plane; thres=-200; read only 1st+2nd plane 2003-07-20 b2p021 run 1633 1639 MUSI alpha trigger all Musi planes; thres=-100; read only musi 2003-07-21 b2p025 run 1640 1641 LAND cosmics LAND cosmics; found during run that LAND partially down... 2003-07-21 b2p026 run 1642 LAND cosmics LAND cosmics; HV back up, but tupes still cold ... 2003-07-21 b2p026 ### Redone FADC pedestals; Now 142Nd @ 600 A MeV 2003-07-21 b2p028 ### Anode PreAmp FADC phys 10(6) failed again !! 2003-07-22 b2p028 run 1643 142Nd Sn/500 Paddle+2^-7 beam; Si Strip in; FADC baseline in FADC 3(0) bad 2003-07-22 b2p028 run 1644 142Nd Sn/500 dito; no proper (+60V) bias in Si strip 2003-07-22 b2p028 run 1645 142Nd Sn/500 beam trigger w/ cosmics readout; to debug Si strip 2003-07-22 b2p028 run 1646 142Nd Sn/500 dito; sweep over Si strip with steerers 2003-07-22 b2p028 ### FADC baselines redone 2003-07-22 b2p028 run 1647 1657 142Nd Sn/500 Paddle+2^-7 beam; normal data taking; HVprop = 2450V 2003-07-22 b2p029 run 1658 1659 LAND cosmics LAND cosmics 2003-07-22 b2p029 ### Camac QDC's 8 and 10 exchanged (now 2249W for FRS fingers) 2003-07-23 b2p036 run 1660 1662 142Nd Sn/500 Beam trigger; Pilot beam via FRS @ 860 AMeV 2003-07-23 b2p036 run 1663 1664 142Nd Sn/500 Beam trigger; Pilot beam via FRS @ 860 AMeV; Final QDC/TDC setup 2003-07-23 b2p036 run 1665 142Nd Sn/500 Beam trigger; Pilot beam via FRS @ 820 AMeV; 2003-07-23 b2p037 ### ROLU OR now in bit 19 or coinicence register (-> apat) 2003-07-23 b2p037 run 1666 142Nd Sn/500 Beam trigger; Pilot beam via FRS @ 620 AMeV; ALADiN too high 2003-07-23 b2p037 run 1667 1668 142Nd Sn/500 Beam trigger; Pilot beam via FRS @ 620 AMeV; ALADiN ok now; ROLU in 2003-07-23 b2p037 run 1669 1670 142Nd Sn/500 Beam trigger; Pilot beam via FRS @ 620 AMeV; ROLU out; Si Strip in 2003-07-23 b2p038 ### Repairs: MUSIC opened after cage problems; PreAmp FADC phys 10(6) fixed 2003-07-24 b2p039 run 1671 142Nd Sn/500 Beam trigger(2^-4); Pilot beam via FRS @ 620 AMeV; ALADiN @840 2003-07-24 b2p039 run 1672 142Nd Sn/500 paddle + 2^7 beam; 4-5 k/spill 2003-07-24 b2p040 run 1673 124La Sn/500 Beam trigger(2^-3); FIRST FRS 124La beam; ALADiN@760 2003-07-24 b2p040 run 1674 1679 124La Sn/500 Beam trigger(2^-3); ALADiN@597 to have whole beam in right chamber 2003-07-24 b2p040 ### S2 L+R cables were interchanged (were swapped before) 2003-07-24 b2p040 ### FADC baselines + pedestals redone; FADC 10(6) baseline was wrong since repair 2003-07-24 b2p040 run 1680 124La Sn/500 Beam trigger(2^-3); FRS finger dets under work during run 2003-07-24 b2p040 run 1681 1691 124La Sn/500 paddle + 2^7 beam; ALADiN@740; first try of production run 2003-07-24 b2p040 run 1692 1695 124La Sn/500 paddle + 2^7 beam; ALADiN@740; with Stelzer in 2003-07-24 b2p041 run 1696 1697 124La Sn/500 paddle + 2^7 beam; ALADiN@740; with Stelzer in; ROLU to 20mm in x 2003-07-24 b2p041 run 1698 1700 124La Sn/500 2^3 beam; ROLU open again; Stelzer out; Z diode 1 in 2003-07-24 b2p041 run 1701 124La none paddle + 2^7 beam; Target out; strip out; Z diode out; ROLU 30x30 2003-07-24 b2p043 run 1702 1703 LAND cosmics LAND cosmics 2003-07-24 b2p043 run 1704 PROP radio looking for discharges in 1st+2nd prop plane; gate closed 2003-07-24 b2p045 run 1705 124La none 2^3 beam trigger; checking FRS beam; ToF off, stelzer out, strip out 2003-07-24 b2p045 run 1706 124La none 2^5 beam trigger; dito 2003-07-24 b2p045 run 1707 124La none 2^7 beam trigger; dito 2003-07-24 b2p045 run 1708 124La none 2^5 beam trigger; strip in; stelzer in; ALADiN 740, target out 2003-07-24 b2p045 run 1709 124La none only paddle trigger; strip in; stelzer in; ALADiN 740, target out 2003-07-24 b2p045 run 1710 124La none only paddle trigger; dito, but right ROLU moved into beam by 10 mm 2003-07-24 b2p045 run 1711 124La none only paddle trigger; dito, but strip moved. 2003-07-24 b2p045 run 1712 1719 124La Sn/1000 paddle + 2^7 beam; Stelz out, strip out, ROLU open, ALADiN 740 2003-07-25 b2p046 run 1720 1730 124La Sn/1000 paddle + 2^7 beam; now 4 sec spill; FRS S2 slitt +- 40mm 2003-07-25 b2p047 run 1731 124La Sn/1000 paddle + 2^7 beam; ROLU-R taken out of veto bit 2003-07-25 b2p047 run 1732 124La Sn/1000 paddle + 2^7 beam; ROLU-L taken out of veto bit 2003-07-25 b2p047 run 1732 1734 124La Sn/1000 paddle + 2^7 beam; as 1720-1730 2003-07-25 b2p047 run 1735 124La Sn/1000 paddle + 2^7 beam; ROLU-L taken out; ROLU-R moved 15mm in 2003-07-25 b2p047 run 1736 1737 124La Sn/1000 paddle + 2^7 beam; ROLU standart again; alternate beam tune 2003-07-25 b2p047 run 1738 1751 124La Sn/1000 paddle + 2^7 beam; back to normal ion optics; FRS S2 open, S8 to +-10mm 2003-07-25 b2p050 run 1752 124La Sn/1000 paddle + 2^6 beam; FRS S2 <+-20, S8 open; 2003-07-25 b2p050 ### Added ROLU as veto in interaction trigger; ROLU setting: open, except R moved in 10 mm 2003-07-25 b2p050 run 1753 1759 124La Sn/1000 paddle + 2^7 beam; FRS like 1752 2003-07-25 b2p051 run 1760 124La Sn/1000 paddle + 2^? beam; FRS S8 slits at +-2 (or 3?) mm (to check center) 2003-07-25 b2p051 run 1761 124La Sn/1000 paddle + 2^7 beam; FRS S8 open again 2003-07-25 b2p051 run 1762 124La Sn/1000 paddle + 2^7 beam; FRS S2 somewhat opened (low beam) 2003-07-25 b2p051 run 1763 124La Sn/1000 paddle + 2^7 beam; beam moved by steerer 2003-07-25 b2p052 run 1764 1780 124La Sn/1000 paddle + 2^7 beam; beam intesity back; FRS S1 slit +-20 -> +- 15mm 2003-07-25 b2p052 run 1781 1782 124La none paddle + 2^7 beam; 2003-07-26 b2p052 ### Cathode HV problems at very end of 1782 2003-07-26 b2p052 ### Running night 26/27 with 14.5 KV (10.54 on cage) and gas cleaning off !! 2003-07-26 b2p062 run 1783 1785 124La Sn/1000 paddle + 2^7 beam; FRS finger detector if off... 2003-07-26 b2p062 run 1786 1804 124La Sn/1000 paddle + 2^7 beam; FRS finger back 2003-07-27 b2p063 run 1805 1806 124La Sn/1000 paddle + 2^7 beam; Si Strip in 2003-07-27 b2p063 run 1807 124La Sn/1000 paddle + 2^7 beam; Si Strip in; Stelzer in 2003-07-27 b2p063 run 1808 1813 124La Sn/1000 paddle + 2^7 beam; Strip+Stelzer out again 2003-07-27 b2p066 run 1814 LAND cosmics LAND cosmics 2003-07-27 b2p066 run 1815 PROP radio looking for discharges in 3rd+4th prop plane; gate closed 2003-07-27 b2p067 run 1816 1836 124La Sn/1000 paddle + 2^7 beam; 2003-07-28 b2p068 run 1837 1846 124La Sn/1000 paddle + 2^7 beam; after fixing FRS tune problem (profiler was in) 2003-07-28 b2p068 run 1847 124La Sn/1000 paddle + 2^7 beam; stelzer + strip in 2003-07-28 b2p069 run 1848 LAND cosmics LAND cosmics 2003-07-28 b2p069 run 1849 PROP radio looking for discharges in 3rd+4th prop plane; gate closed 2003-07-28 b2p071 run 1850 124La Sn/1000 2^5 beam; Magnet OFF 2003-07-28 b2p071 run 1851 124La Sn/1000 paddle + 2^7 beam; 2003-07-28 b2p071 run 1852 1853 124La Sn/503 paddle + 2^7 beam; 2003-07-28 b2p072 run 1854 1877 124La Sn/503 paddle + 2^7 beam; switch to 6 sec spill 2003-07-29 b2p074 run 1878 LAND cosmics LAND cosmics 2003-07-29 b2p074 run 1879 PROP radio looking for discharges in 3rd+4th prop plane; gate closed 2003-07-29 b2p074 ### Anode PreAmp FADC phys 3(0) failed again; FADC pedestals redone 2003-07-29 b2p075 run 1880 124La Sn/503 paddle + 2^7 beam; (2 FRS stearers were not correct) 2003-07-29 b2p075 run 1881 1885 124La Sn/503 paddle + 2^7 beam; after FRS stearer were corrected 2003-07-29 b2p075 run 1886 124La Sn/503 paddle + 2^7 beam; after beamline stearer were tuned 2003-07-29 b2p075 run 1887 124La Sn/503 paddle + 2^7 beam; with Strip and Stelzer 2003-07-30 b2p075 run 1888 1903 124La Sn/503 paddle + 2^7 beam; without Strip and Stelzer again 2003-07-30 b2p076 run 1904 1905 124La Sn/503 paddle + 2^7 beam; V_cathode set to 12 kV (check v_drift vs V_cath) 2003-07-30 b2p077 ### Found that LAND pedestals were suboptimal; Redone LAND pedestals 2003-07-30 b2p077 run 1906 LAND cosmics LAND cosmics 2003-07-30 b2p078 ### Cathode HV problems just after 107Sn beam came; some crazy runs... 2003-07-30 b2p078 run 1907 107Sn Sn/503 2^5 beam; Magnet off; V_cath=8kV; 25k/spill; (large track bending) 2003-07-30 b2p078 run 1908 107Sn Sn/503 2^5 beam; Magnet off; V_cath=8kV; 5k/spill; (less track bending) 2003-07-30 b2p078 run 1909 107Sn Sn/503 2^5 beam; ALADiN=720; stopdelay=1080; FADC pedsub off 2003-07-31 b2p078 ### Cathode holds 14.5 kV again 2003-07-31 b2p079 run 1910 107Sn Sn/503 2^5 beam; ALADiN=680; 2003-07-31 b2p079 run 1911 1913 107Sn Sn/503 paddle + 2^7 beam; ALADiN=680; 2003-07-31 b2p079 run 1914 1919 107Sn Sn/503 paddle + 2^7 beam; ALADiN=720; steerer tuned; V_prop=2.48 (from 2.45) 2003-07-31 b2p080 run 1920 107Sn Sn/503 paddle + 2^7 beam; Strip + Stelzer in; 2003-07-31 b2p081 ### Repairs: Cathode insulation; Major mishap destroying all gate driver circurity 2003-08-01 b2p082 run 1921 PROP alpha trigger 3rd+4th Prop plane; thres=-200; V_Prop=2.48 kV; stopdelay=980 2003-08-01 b2p082 run 1922 142Nd 1:1 beam via cosmics readout; 600 AMeV; Wedge run 0->2000 2003-08-01 b2p082 run 1923 142Nd 1:1 beam via cosmics readout; 600 AMeV; Wedge run 2000->0 2003-08-01 b2p082 run 1924 142Nd 1:1 beam via cosmics readout; 300 AMeV; Wedge run 2000->900 2003-08-01 b2p082 run 1925 142Nd 1:1 beam via cosmics readout; 300 AMeV; Wedge run 900->2000 2003-08-01 b2p083 run 1926 PROP alpha trigger 3rd+4th Prop plane; thres=-200; V_Prop=2.48 kV; stopdelay=580 2003-07-31 b2p084 ### Repairs: Gate drivers and controlers replaced 2003-08-01 b2p084 run 1927 PROP alpha trigger 3rd+4th plane; thres=-200; V_Prop=2.43 kV; delay=580; read all 2003-08-01 b2p085 run 1928 PROP alpha trigger 3rd+4th plane; dito, but read only 3rd+4th plane 2003-08-02 b2p085 run 1929 107Sn Sn/503 paddle + 2^7 beam; ROLU not yet in final position 2003-08-02 b2p085 run 1930 1939 107Sn Sn/503 paddle + 2^7 beam; ROLU o.k. now; ALADiN=720 2003-08-02 b2p086 run 1940 LAND cosmics LAND cosmics 2003-08-02 b2p087 run 1941 107Sn Sn/503 paddle + 2^7 beam; before tune-up 2003-08-02 b2p087 run 1942 107Sn Sn/503 paddle + 2^7 beam; steerer changed 2003-08-02 b2p087 run 1943 1951 107Sn Sn/503 paddle + 2^7 beam; steerer changed again; 2003-08-02 b2p088 run 1952 1972 107Sn Sn/503 paddle + 2^7 beam; changed FRS S2 foil; Z=50 now stronger 2003-08-03 b2p092 run 1973 1974 LAND cosmics LAND cosmics 2003-08-03 b2p092 run 1975 107Sn Sn/1000 paddle + 2^7 beam; two FRS steerers were off during run 2003-08-03 b2p092 run 1976 107Sn Sn/1000 paddle + 2^7 beam; FRS steerers on now 2003-08-03 b2p092 run 1977 1996 107Sn Sn/1000 paddle + 2^7 beam; move in S8 left slit to minimize ROLU veto rate 2003-08-04 b2p093 run 1997 107Sn Sn/1000 paddle + 2^7 beam; Stelzer + Strip in 2003-08-04 b2p093 run 1998 2003 107Sn none paddle + 2^7 beam; NO Target, no Stelzer and Strip 2003-08-04 b2p095 run 2004 C/600 Sn/503 paddle + 2^7 beam; 2mm start foil; short spills 2003-08-04 b2p095 run 2005 C/600 Sn/503 paddle + 2^7 beam; 2mm start foil; still short spills; no pileup reject 2003-08-04 b2p095 run 2006 C/600 Sn/503 paddle + 2^7 beam; 2mm start foil; long spills; no pileup reject 2003-08-04 b2p095 run 2007 C/600 Sn/503 paddle + 2^7 beam + 2^6 random trigger 2003-08-04 b2p095 ### Added FRS S2L/S2R into pipeline TDC 2003-08-04 b2p095 run 2008 2009 C/600 Sn/503 paddle + 2^7 beam + 2^7 random trigger; random trig off during 2009 2003-08-04 b2p095 run 2010 C/600 Sn/503 paddle + 2^7 beam; 2003-08-04 b2p095 run 2011 2014 C/600 Sn/503 paddle + 2^7 beam; Prop HV readjusted (2.47->2.48) 2003-08-04 b2p096 run 2015 C/600 Sn/503 beam + cosmics readout; ToF Sweep, ALADiN 0->2000->0 2003-08-04 b2p096 run 2016 C/600 Sn/503 beam; ToF+MUSI 'sweep', ALADiN 0->200 2003-08-05 b2p096 run 2017 2020 142Nd Sn/503 beam trigger; Pilot beam via FRS (620@Cave) old S2 scin; ALADiN=840 2003-08-05 b2p096 run 2021 2022 142Nd Sn/503 beam trigger; Pilot beam via FRS (620@Cave) new S2 scin; ALADiN=840 2003-08-05 b2p097 run 2023 2025 124La Sn/503 paddle + 2^7 beam; ALADiN=740; Prop 2.48kV; 2003-08-05 b2p097 run 2026 2033 124La Sn/503 paddle + 2^7 beam; ALADiN=740; Strip in; Prop 2.45kV; 2003-08-05 b2p097 run 2034 124La Sn/503 paddle + 2^7 beam; ALADiN=740; Strip in; Stelzer in; 2003-08-05 b2p097 run 2035 124La Sn/503 paddle + 2^7 beam; ALADiN=740; dito, but after Steerer/ROLU corrected 2003-08-05 b2p097 run 2036 124La Sn/503 paddle + 2^7 beam; ALADiN=740; dito, but modified Steerer 2003-08-05 b2p097 run 2037 2045 124La Sn/1000 paddle + 2^7 beam; ALADiN=740; Strip/Stelzer out again 2003-08-05 b2p098 run 2046 LAND cosmics LAND cosmics 2003-08-06 b2p099 run 2047 2050 PROP cosmics PROP cosmics; ToF+PROP trigger(1st+2nd plane); V_prop=2.7 kV 2003-08-06 b2p099 run 2051 HODO pulser HODO pulser (using NO-FADC readout); a1+a2 pulsed, M=16 2003-08-06 b2p099 run 2052 HODO pulser HODO pulser (using NO-FADC readout); a1 pulsed, M=8 2003-08-07 b2p099 run 2053 2058 PROP cosmics PROP cosmics; ToF+PROP trigger(1st+2nd plane); V_prop=2.65 kV 2003-08-07 b2p099 ### Added ToF OR and FADC OR in last two event scaler inputs 2003-08-07 b2p099 run 2059 2072 PROP cosmics PROP cosmics; dito; V_prop=2.60 kV 2003-08-08 b2p100 run 2073 2077 PROP cosmics PROP cosmics; dito; V_prop=2.60 kV; fixed LAND FCLR, LAND now o.k. 2003-08-08 b2p100 run 2078 MUSI alpha MUSI alpha; Trigger all 6 IC modules; HV_cathode=15kV 2003-08-08 b2p101 run 2079 MUSI radio MUSI radio; Trigger 4 IC modules without alpha source 2003-08-08 b2p101 run 2080 2088 MUSI radio MUSI radio; dito, but only 4 FADC read, short length/stopdelay 2003-08-11 b2p101 run 2089 MUSI radio MUSI radio; dito, but gas cleaner off 2003-08-11 b2p101 run 2090 2094 MUSI radio MUSI radio; dito, but added FADC 17 (1 alpha source) in trig+readout 2003-08-12 b2p102 run 2095 time calib Time calibrator FBUS; 10ns period 2003-08-12 b2p102 run 2096 time calib Time calibrator FBUS; 20ns period 2003-08-12 b2p102 run 2097 time calib Time calibrator CAMAC; 20ns period 2003-08-12 b2p102 run 2098 time calib Time calibrator CAMAC; 10ns period 2003-08-14 b2p102 run 2099 time calib Time calibrator LAND; (done with stand-alone LAND DACQ).