S117 Meeting, 20.6.95
DE-E gaps
The gaps for the 100 AMeV beam time are closed, the gaps for 1000 AMeV not yet. In DE remains a gap
of about 50 channels which has to be considered as normal due to the wrong pedestals. Volker is
preparing a pass 1 after that all pedestals should be determined right. Burckhart will have a look to his
gaps to check how they look like now.
ZDO
Sebastian tried out bands in DE-E and interpolated linearly between them. With the PID of 4 added
detectors he showed that the method in principle works.
DAQ
Walter gave a short introduction in the calibration capabilities of PAW:
June 20th, 1995 Carsten Schwarz,