Another problem was a 3% crosstalk signal on the shaper channels which was independent of which channels were used. There might be some problem with the grounding of the shaper.
The new PM bases are mounted and the possible overlap in angle between the ZDO mounting and the hodosopes is removed.
The Jopl preamps are modified. They have now a high gain (100) and a low gain (10) output and both will be used in the experiment.
Because there will be another Stelzer detector behind the TOF chamber, the amount of material in the beam should be as small as possible.
Sally Gaff will be at GSI between 3.4-24.5.
Simplifiying the DAQ startup procedure is still under construction. It is no longer possible to overwrite the pedestal file by accident (at least we hope so ;-)).
For the Start detector a new foil ladder with less material will be used. The so called Folger target frames are used which are shaped in a fashion that a particle which produces light in the scintillating foil will not hit the ladder. Besides the size in y-direction will be larger.