S117 Meeting - 7.2.1995

--------------------------------------------------------------------------------
Detector	| responsible	| Status
--------------------------------------------------------------------------------
START		| U.K. W.T.	| One hybrid tube one old "active" tube 
		|		| mounted.
--------------------------------------------------------------------------------
CATANIA Hodo	| Catania +	| 1 preamp bank is changed - Test signals 
		| Milano	| are and alpha particles are seen.
--------------------------------------------------------------------------------
GSI/MSU Hodo	| B.O. M.S.	| 1 CsJ preamp broken, because no pulser signals
		|		| on this channel could be seen (?). 2 noisy 
		|		| channels. Cooling for GSI works fine, up to
		|		| now the MSU is not integrated in the cooling
		|		| cycle.
--------------------------------------------------------------------------------
Telescopes	| X.H.		| The low gain preamps do not work after 
		|		| pumping the chamber. They should be replaced 
		|		| by prop counter preamps.
--------------------------------------------------------------------------------
Si Strips	| C.S.		| Short cut in signal cables -> No bias -> 
		|		| chamber has to be opend up again.
--------------------------------------------------------------------------------
TOF + ZDO + JOPL| S.F. C.G. T.O.| TOF all channels tested. HV test for ZDO up to
		|		| now not possible because of problems with the
		|		| ESONE server but all cables are checked. The 
		|		| signal test should be done in the vacuum.
--------------------------------------------------------------------------------


Sebastian Fritz