-------------------------------------------------------------------------------- Detector | responsible | Status -------------------------------------------------------------------------------- START | U.K. W.T. | One hybrid tube one old "active" tube | | mounted. -------------------------------------------------------------------------------- CATANIA Hodo | Catania + | 1 preamp bank is changed - Test signals | Milano | are and alpha particles are seen. -------------------------------------------------------------------------------- GSI/MSU Hodo | B.O. M.S. | 1 CsJ preamp broken, because no pulser signals | | on this channel could be seen (?). 2 noisy | | channels. Cooling for GSI works fine, up to | | now the MSU is not integrated in the cooling | | cycle. -------------------------------------------------------------------------------- Telescopes | X.H. | The low gain preamps do not work after | | pumping the chamber. They should be replaced | | by prop counter preamps. -------------------------------------------------------------------------------- Si Strips | C.S. | Short cut in signal cables -> No bias -> | | chamber has to be opend up again. -------------------------------------------------------------------------------- TOF + ZDO + JOPL| S.F. C.G. T.O.| TOF all channels tested. HV test for ZDO up to | | now not possible because of problems with the | | ESONE server but all cables are checked. The | | signal test should be done in the vacuum. --------------------------------------------------------------------------------