S117 Meeting - 30.1.1995 - 13:00
-
Attendance:
M. Begemann-Blaich (since 13:20), S. Fritz, C. Groß, X. Hongfei,
U. Kleinevoß (since 13:30), J. Luehning, W.F.J. Mueller (since 13:30),
B. Ocker, T. Odeh, J. Pochodzalla, C. Schwarz
-
Topics:
-
TOF:
HV test is possible as soon as Esone server is running in normal mode. The laser
system is adjusted. The motor for the second wedge is unplugged so that only the
first wedge will be used.
-
GSI:
Cabling is finished. During the testing problems with two silicons arose. In one
the noise in one quadrant increased when the bias was swithced on. In the second
silicon a signal in one quadrant was missing, but the resistance was ok. Some
Temperature devices have to be installed.
-
Catania:
All cables exept the power supply in the chamber are connected.
Only two preamplifier boxes are mounted in the chamber. There will be 16 spare
channels in the box for the silicon strips.
-
ZDO:
Cables inside the chamber are mounted. The temperature measurement has to be
brought in.
-
MSU:
16 detectors are mounted. We are not sure about the vacuum tightness of the
flanges.
-
Start:
The Start detector box should be mounted before the vacuum test.
-
Telescopes / Si-strips:
The mounting is inside the chamber. For the system the 4-channel power supplies
will be used.
-
Electronics:
The electronics (logic, stretchers ...) will be installed by the Italians, who
are at GSI this week.
-
Next meeting:
2.2.1995 - 13:00
Sebastian Fritz