Catania 5 + 1 for Cooling GSI 4 + 2 for HV/Preamp Si-Strips + ZDO 2 Target 1 Telescopes 1 Halo 1 BNC flange ZDO HV 1 with MIL norm connectorsTwo more vacuum tight flanges have to be build. The Cannon connectors are ordered and will arrive within two weeks.
Long discussion wether the preamps for Silicon strips and telescopes should be outside or inside the target chamber. In terms of cabling and cooling outside is easyier.
There will be a window at the frontside of the chamber where a camera can be installed which looks on the target.
For the different HV runs one should look for the alpha punchthrough instead of the slope of a exponential fit. The puzzle with the "gamma-line" in the spectra is still not clear. One should look at the yields for different cuts and do some multiplicity cuts.